Search the Community

Showing results for tags 'task view'.



More search options

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • Company news
    • General announcements
  • ftrack Studio (main app)
    • General discussion
    • Feature requests
    • API
    • Help
    • Actions and Widgets
    • ftrack Go
  • ftrack Review
    • General discussion
    • Feature requests
    • Help
  • Connect and plugins
    • General discussion
    • Connect package releases
    • Feature requests
    • Help
    • Connect plugins releases
  • Advisory Forum
  • Tech preview
    • API
    • New integrations
    • Studio overview
    • ftrack Review

Categories

There are no results to display.


Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Joined

  • Start

    End


Group


AIM


MSN


Website URL


ICQ


Yahoo


Jabber


Skype


Location


Interests

Found 3 results

  1. Hello, When creating a tasks view with task attributes, the tasks within a folder are stacked on a seperate row than any tasks not in within a folder. This makes the view very clunky, and requires the user to collapse and expand folders all the time to get them to appear in the task attribute columns. Is there a way around this? Thanks, -Phil F
  2. When scheduling tasks and users in the task view it's really useful to see now the project plan and the resource timeline on the bottom of the gantt diagram. Unfortunately it's getting very confusing, since the 3 timelines could have different scales and positions in time. I have always to match the timelines to have a good overview and to see on the same date line if I can schedule a user and if it is still fitting to my plan If I'm not manually matching the 3 timelines I'm looking e.g. into my gantt schedule from January 29th till the 13th of February, the project plan is focusing between December 29th and January 19th and the resource timeline is showing dates between December 24th and January 13th. Even manually I'm not 100% able to have all dates in one line. Would it be better to scale and move all tree timelines at the same time, with the same (one) method? P.S.: I have still issues to upload screenshots "There was a problem processing the uploaded file. Please contact us for assistance. "
  3. Hi there, I'm having a bit of a hard time keeping my list of tasks in the web view organized. I do like the various ways of filtering the view but one thing that is hindering my workflow is that the filtering always hides the unrelated tasks away. I'd like to have an overview of all tasks (filtered or not) but also have a visual guide as to which tasks are relevant to me. For example if I have a list of 50 tasks that are all related to a specific group/project/idea/tag but I personally only am interested in three of them. In such a case I would like to see all 50 of them but still be able to point out the ones that I'm interested in at the moment. As my interest might change over time I would like to be able to visually change the tasks relevant to me without loosing the overview of the whole. For me, the best case scenario would be if I could simply right-click on a task and assign a custom color to it. The color could be freely chosen and saved into a list of colors to choose from. I could also imagine this being a filter that can be applied to the view so that one can toggle it on or off. So basically it would be a filter that doesn't hide items that don't match the filter but shades the ones that do in a specific way. That color/filter would only be visible by my user or whoever chooses to apply it on their view. This would greatly improve the readability of long lists of tasks without forcing me to switch the filters to show a subset of tasks. Having to switch between filtered tasks is time consuming and in some cases frustrating as it's not easy to create filters that will only match the tasks required. Loosing the overview over other tasks that are currently not relevant to me but might become in the future is also a constant hiccup in my workflow. I hope this finds some resonance in the ftrack HQ as something to look into for a future release. Please see the attached screen capture as an example. Best, Vladimir