Jump to content

Search the Community

Showing results for tags 'nuke studio'.

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • Company news
    • General announcements
  • ftrack Studio (main app)
    • General discussion
    • Feature requests
    • API
    • Help
    • Actions and Widgets
    • ftrack Go
  • ftrack Review
    • General discussion
    • Feature requests
    • Help
  • Connect and plugins
    • General discussion
    • Connect package releases
    • Feature requests
    • Help
    • Connect plugins releases
  • Advisory Forum
  • Tech preview
    • API
    • Connect 2.0 beta
    • New integrations

Categories

There are no results to display.


Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Joined

  • Start

    End


Group


Website URL


Location


Interests

Found 2 results

  1. Hi, We are using an un-managed storage scenario as we are starting to roll out ftrack across our facility and have an existing folder structure that can't easily be changed. We usually do a high volume of shots so I really want to be able to name shots and assign tasks from nuke studio. Now the day we had a support zoom with ftrack and changed from our testing centralised storage back to the automatic unmanaged storage, Nuke Studio seemed to work from connect and I was able to do what I want but now when I try to launch Nuke Studio from connect I get this error: "ftrack.unmanaged" is an invalid location for Nuke Studio to work with. Nuke/NukeX seem to work pretty well from connect and I can do everything from there but we really want to use all the studio features. I've downloaded the latest plugins from here too. Any ideas? Cheers, Toby Angwin BluePost
  2. I'm using Nuke Studio to export a large number of shots that have been retimed. The entire project was shot in slow motion and then sped up considerably in edit. Ftrack doesn't see the retiming, though. The frame counts and previews are based on the source footage. It's not a huge deal, but on some of the more extreme retimes -- one goes from 1,336 frames to 36 frames -- I'm uploading a considerable amount of data. Is there a workaround for this? Thank you!
×
×
  • Create New...